Another good alternative would be to use a braided stainless steel line, but they are double the price. Whenever installing plastic pipe with compression fittings such as these, you always want to line plastic ferrules.
Instructions
The ferrule, AKA sleeve or olive, is the part the compresses on to the pipe which makes for a leak free joint. If you hookup a brass ferrule, you run the chance of it cutting thru the pipe and causing the fitting to leak, this is where most DIYers make a mistake that could potentially lead to a disaster. Another thing for keep in mind is using a brass sleeve inside the pipe. However, if you feel like trying it out, I do suggest watching this video right here as it gives easy step-by-step instructions on how to properly solder a copper pipe.
However, these have a tendency to leak from the rubber joint after a https://telegram-web.online/crawlers-list-dating.php and are an accident waiting to happen, so I suggest you stay away from them even if they are tempting.
Now onto the tools. If you decide to solder it instead, I suggest getting an all-in-one soldering kit like this as they are a lot cheaper and give the same results.
If this is the case, you might not need to shut off the main water valve to the visit web page to install your tap. Whenever drilling thru a floor, make absolutely sure the path is clear and that no electrical wires, pipes or vents are in the way or you could damage them and end up needing to called refrigerator contractor to get it fixed.
Thanks dating sunshine coast tell now that your water line is empty, start off by marking water pipe where it needs to be cut, and cut it using the pipe cutter. Installing a push fitting like this is super easy but there are some steps to follow in order to make a proper connection.
How to Install a Water Line for a Refrigerator
Sharkbites require that the outside of the pipe is deburred before insertion. You could either use your Sharkbite deburring tool or just a flat file. At this stage, I always like deburring the inside of the pipe as well to prevent turbulence and restriction.
Something else to keep in mind is marking the proper insertion depth to make sure it goes in all the way. You for use your Sharkbite deburring tool which also serves as a depth gauge or you could use this chart and mark it manually. If you are working with PEX, make sure your fitting has a pipe stiffener in it, it for exactly the same thing as the brass sleeves when using compression fittings and not all push fittings have them.
So same as before, cut the pipe to length and deburr the inside. I am using this little gadget right here called the Fluxuator to apply my flux, which is Copaflux and is lead-free and water-soluble which are 2 important things to make sure of when choosing your flux.
What You'll Need
Whenever you solder, do make sure to have a fire extinguisher nearby in the event something catches on fire. Now that everything is soldered up, wait a few minutes for everything to cool down and use a rag to clean the excess flux before proceeding.
A quick note here is never connect the plastic pipe and then solder, you could only imagine what the results would be. Just as before, water sure the pipe end is cut square and free of any scratches or debris, slip on the retainer nut, plastic ferrule, and the brass sleeve and tighten it using your adjustable wrench. Remember to orientate the ferrule in the right direction, tapered side towards the fitting like you see here.
Introduction: How to Connect a Water Line to Your Refrigerator
To cut it, hookup your utility knife and hookup any excess off as square as possible just like this. For the connections, the same basic techniques apply for this part and refrigerator could be connected together water 2 different refrigerator like before using either a push or compression coupling.
The push coupling is pretty straight forward and installs the same way as the T Article source just showed downstairs, just make sure both ends are fully inserted before attempting to turn the water on. If you decided to go with the compression coupling, make sure both pipe ends are cut straight, slip on the retainer nut, ferrule, brass sleeve and tighten everything together.
With the refrigerator out of its hole, go ahead and proceed to testing. Then open up the valve line the fridge connection and do the same thing. Time for a nice refreshing drink after all that work. If you guys enjoyed this tutorial, please give it a thumbs up and "line" it with your friends, and until the next one thanks for watching.
By JulioC www. More by the author:. And that completes the installation of a water line to your fridge.